Use the arrows to change images in the gallery. Click on any image to see it full size.
Contact us here to speak to us or to arrange an appointment.
Twitch, London
CAT B fit out
Design and build
Contract value – £136,000.00
- Design of mechanical services
- Modifications to the existing Daikin VRV IV system on all floors
- Modifications to the existing primary and secondary ventilation on all floors
- Meeting room acoustics
- Comms room cooling system with auto change over
- Comms room leak detection system
- Tea point plumbing services
- Tea point leak detection system
- Tea point extract systems
- Building management system controls to all floors
- Commissioning
- Client training