The Royal Albert Hall, London
CAT B fit out
Design and build
- Design of mechanical services across the level 2 Basement
- Validation of existing services
- Isolation and disconnection of the water & waste from the existing WC
- Services capped locally ready for reinstallation to suit the new layout
- Supply and install of 1no. four pipe chassis type fan coil unit complete with return air filters
- LTHW + CHW pipework modifications to serve the new FCU and radiators in the basement
- Back Flushing of the new LTHW +CHW pipework
- Supply of all necessary water treatment to all new minor modifications
- LTHW + CHW microbiological & chemical sampling
- Extension & modification of the extract ductwork serving the level 2 Basement WCs
- Extension & modification of the supply ductwork serving the level 2 Basement office space
- Supply and install of the new secondary ductwork; with each section installed with a VCD, to serve the level 2 basement office
- Supply and installation of all grilles + diffusers as per the tender documentation
- Relocation of the existing WHB with modifications to the pipework and 2nd fix
- Supply and install of the new water + waste services to serve the new WC
- Chlorination, sampling and certification of all the new pipework
- Supply and install of insulation to the supply air ductwork
- Supply and install of insulation to the LTHW, CHW and domestic pipework
- BMS Control works as per the specification for mechanical services
- Testing and commissioning
- Certification upon completion