Shark Ninja, Battersea Power Station, London
CAT B fit out
Design and build
- Design of mechanical services across the 3rd & 4th floors
- Ventilation systems to serve the town hall located on the 3rd & 4th floor
- LTHW and CHW pipework modifications across the floors
- Pipework freezing across the floors to allow for the relocation and additions to the existing systems
- LTHW and CHW back flushing and sampling
- Modifications to the primary, secondary and extract ductwork to suit the new layout
- Supply of new linear grilles and plenums
- Supply and installation of cross talk attenuators
- Supply and installation of a shunt fan to serve the battery room
- Mini VRV air conditioning system to serve the pantry and show room kitchen
- Extract system to serve the 3rd & 4th floor staff tea points
- Supply and installation the Halton extract air handling units to serve the 3rd floor demo kitchen
- Supply and installation of a Halton extract hood to the 3rd floor kitchen
- Comms room cooling
- Plumbing services to serve both staff tea points located on the 3rd & 4th floor, beauty bar, pantry and demo kitchen on the 3rd floor
- BMS controls
- Leak detection located in the Comms room to serve all the wet areas across both floors
- Chlorination of all the new domestic pipework
- Insulation to all the new primary and secondary ductwork
- Testing and Commissioning