RenRe, London
CAT B fit out
Design and build
- Design of mechanical services across the 22nd and 23rd floors
- Isolation and disconnection of all secondary ductwork from all the existing fan coil units across floors 22 and 23
- Isolation and disconnection of the CHW pipework to the 48no fan coil units being replaced across both floors, along with fan coil unit controls to the associated fan coil units, ready for reinstallation to the new units across the floors
- Supply and Installation of 47 two pipe (CHW) fan coil units with chassis suitable for ceiling void mounting
- Installation of electric heater batteries to serve all the fan coil units across the floors
- Acoustically lined discharge plenums and extended drip trays have been installed to serve all associated fan coil units across both floors
- Chemical flushing, back flushing and sampling to all the modified CHW pipework
- Install of all new solid galvanised steel primary ductwork, with each section being installed with volume control dampers
- Supply and installation of all new secondary ductwork across both floors to suit the new layouts with each section being installed with a VCD
- Supply and installation of cross talk attenuators across both floors to allow for attenuated return air path
- New variable Air Volume devices to allow for optimal air flow via dampers to the fan coil units situated within the meeting offices across both floors
- Supply and installation of bespoke supply air grilles to serve both floors
- Supply air and return air plenums to serve the new loft lobbies on both floors
- New supply air valves and return air valves to serve the WCs on both floors
- 1st and 2nd fix plumbing services to serve the tea point areas, bar/ break-out in reception and the prep tea point room on the 22nd floor
- 1st and 2nd fix plumbing services to serve the new tea point areas, well being room and tea point drop off on the 23rd floor
- 2nd fix of all new sanitaryware to the new male, female, DDA and cleaners’ cupboards on both floors
- Chlorination and sampling for water analysis on all new BCWS pipework with certification upon completion
- Supply and installation of a new Andel leak detection panel with a sensing cable linked, located within the comms room of the 23rd floor, which shall shut off and sound an alarm on leak detection or fault
- Supply and installation of BMS controls across both floors
- 2no Mitsubishi wall mounted split systems, each delivering 9.5kw of normal cooling, with condensers located at roof level, to serve the Comms rooms on both floors
- Supply and installation of 25mm thick foil faced ridged mineral fibre insulation to the domestic and CHW pipework across both floors
- Commissioning of all the new CHW pipework, Comms room cooling systems, BMS controls and all interfaces