P-Cubed , London
CAT A & B fit out
Design and build
- Design of mechanical services to this 8-floor office building
- Strip out of existing plumbing services to make way for new
- Decommissioning of existing Mitsubishi AC system and disconnection/strip out of ductwork from the lower ground floor to the 6th floor
- Supply and installation of a Daikin VRV heat recovery system to serve the lower ground floor to the 6th floor
- Supply and installation of new MVHR ventilation systems to serve the lower ground floor to the 6th floor
- Supply and Installation of new supply grilles and plenums to lower ground floor to the 6th floor
- New plumbing services to the new tea point, shower, WC, DDA WC and shower on the ground floor
- Supply and installation of new plumbing services including hot water heaters to the tea points on the 1st & 2nd floors
- Supply and installation of new plumbing services including hot water heaters to the WC on the 5th & 6th floors
- Insulation of all new domestic pipework on the Ground, 2nd, 5th and 6th floors
- Supply and installation of leak detection to all the tea points and the coffee bars across all floors
- Supply and installation of new external condensers to serve the lower ground floor to the 6th floor, craned to the roof by a specialist lifting team.
- Chlorination of new domestic pipework and certification
- Testing and Commissioning
- Client training and demonstration