P-Cubed , London

CAT A & B fit out
Design and build

  • Design of mechanical services to this 8-floor office building
  • Strip out of existing plumbing services to make way for new
  • Decommissioning of existing Mitsubishi AC system and disconnection/strip out of ductwork from the lower ground floor to the 6th floor
  • Supply and installation of a Daikin VRV heat recovery system to serve the lower ground floor to the 6th floor
  • Supply and installation of new MVHR ventilation systems to serve the lower ground floor to the 6th floor
  • Supply and Installation of new supply grilles and plenums to lower ground floor to the 6th floor
  • New plumbing services to the new tea point, shower, WC, DDA WC and shower on the ground floor
  • Supply and installation of new plumbing services including hot water heaters to the tea points on the 1st & 2nd floors
  • Supply and installation of new plumbing services including hot water heaters to the WC on the 5th & 6th floors
  • Insulation of all new domestic pipework on the Ground, 2nd, 5th and 6th floors
  • Supply and installation of leak detection to all the tea points and the coffee bars across all floors
  • Supply and installation of new external condensers to serve the lower ground floor to the 6th floor, craned to the roof by a specialist lifting team.
  • Chlorination of new domestic pipework and certification
  • Testing and Commissioning
  • Client training and demonstration