Use the arrows to change images in the gallery. Click on any image to see it full size.

Contact us here to speak to us or to arrange an appointment.

On Running, Battersea Power Station, London

Cat B Fit out
Design & Build

  • Design of mechanical services
  • Supply of four and two pipe fan coil units; supplied by Aermec, with discharge plenums acoustically lined
  • Extended drip trays that extend to the length of the un-insulated valve assemblies
  • Supply and installation of all new LTHW + CHW copper pipework across the floor
  • All new plastic condensate pipework across the floor
  • All necessary flushing and sampling to the full LTHW and CHW systems
  • Supply and installation of all the primary and secondary ductwork across the floor
  • Supply and installation of fire rated fire dampers across the floor
  • Plenums and new grilles of varying shapes and sizes installed across the floor
  • Free issue BMS controls to serve the new fan coil units across the floor
  • Installation of the LTHW flow and return pipework to the megaflo hot water cylinder as per the tender drawings
  • Supply and installation of CW pipework from the cylinder to serve the WC and kitchen outlets
  • 1st + 2nd fixed plumbing services to serve the new WC and tea point area
  • Supply and installation of above ground drainage to serve the WC and Kitchen as per the tender drawings
  • Chlorination of all the new pipework with samples and certification on completion
  • Supply and instal of insulation to the supply air ductwork to the domestic, LTHW + CHW pipework
  • Testing and Commissioning
Bryair Mechanical Ltd
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.