Minster Building, London
CAT A fit out
Design and build
- Design of mechanical services to the 6th floor
- Validation of existing services
- Isolation and disconnection of 21 fan coil units across the floor with 10 units relocated to suit the new layout
- Modifications to the primary ductwork to serve the relocated fan coil units across the floor
- Supply and installation of new fan coil units across the floor with discharge plenums acoustically lined
- Supply and installation of new secondary ductwork to serve the new fan coil units
- LTHW + CHW pipework modifications across the floor
- Chemical cleaning, sampling and certification of all LTHW + CHW pipework across the floor
- All ductwork installed in Galvanized Steel duct with VCDS installed to allow airflow
- Supply and installation of new fire dampers
- Relocation of the supply air grilles across the floor
- Extension of the network to the BMS controls to serve the fan coil units across the floor
- Insulation to the supply air ductwork
- Ductwork internal cleaning with samples and report
- Testing and commissioning