Use the arrows to change images. Click on any image to see it full size.

Contact us here to speak to us or to arrange an appointment.

 

Grainger, London

CAT A fit out
Build

  • Build of mechanical services across the ground and 1st floors
  • Validation of existing services
  • Isolation, draining & making safe of all existing systems
  • Condensers located at roof level
  • New Daikin VRV air conditioning equipment to serve both floors
  • New Daikin MVHR units, installed at high level to serve both floors: linked to the central Daikin touch controller
  • Supply & installation of all the new primary and secondary ducting to serve all the new fan coil units across both floors
  • Installation of volume control dampers via the duct to supply air to each fan coil unit
  • Attenuators supplied by Caice, designed by DSA, to suit the areas they serve
  • Supply & installation of all the grilles, diffusers, louvers and plenums as per the tender schedules
  • Supply and installation of one 70litre and one 10litre hot water heaters to serve the ground and 1st floor toilets
  • Supply and installation of two water meters
  • 2nd fixed all free issue sanitaryware across both floors
  • 1st and 2nd fixed above ground drainage to serve the kitchen area
  • Supply and Installation of a leak detection system to the toilets and wet services
  • Chlorination and sampling of all hot and cold water services upon completion and certification
  • Installation to all primary & secondary ductwork, domestic hot & cold pipework and LTHW flow & return pipework
  • Testing and commissioning