Croudace, Letchworth Garden City

Cat A + B Fit out
Design & Build

  • Design of mechanical services
  • Supply and installation of new VRV air conditioning equipment across the ground & 1st floors
  • Supply of new overdoor heaters to the ground floor to serve the main entrance and above the door to the breakout area
  • Comms room cooling system consisting of a Daikin DX split system with a total UK sensible cooling of 5.32kw
  • New Daikin heat recovery ventilation units across both the floors
  • Supply and installation of all new primary and secondary extract ducting systems
  • Cross talk attenuators to serve the office and meeting room partitions
  • A new Vent Axia ACM unit to serve the cleaners sink
  • Installation of all new grilles and plenums
  • Supply, installation and commission of a BMS TREND control panel
  • Above ground drainage to serve the ground & the 1st floor toilet & shower areas
  • New waste pipework to serve the new cleaners sink located on the ground floor
  • Plumbing services to serve both the ground floor & 1st floor toilet, shower area and the breakout
  • 30L Ariston water heaters to serve the staff tea points
  • Supply and installation of a new Heatrae Sadia hot water cylinder tank, located in the cleaner’s cupboard on the ground floor to serve the ground & 1st floor WC’s and showers
  • Installation to the primary and secondary supply air ductwork and the domestic pipework
  • Chlorination of all the new domestic pipework and certification
  • Testing and commissioning
  • Client training and demonstration